Project Details

Location: 
Lincoln, NE
Owner: 
Kawasaki Motors Manufacturing Corporation
Size: 
272,000 SF Addition
Market: 
Industrial & Manufacturing
Method: 
Construction Management

Kawasaki Rail Car Addition

The Kawasaki Rail Car Manufacturing Facility project consisted of a multi-phase, fast-tracked expansion. Phase one consisted of a 55,000 SF addition designed for final assembly of new rail cars as well as a storage area for completed rail cars prior to shipping. This phase added one clear span bay 85’ x 650’.  Phase two consisted of a 136,000 SF addition to be used for rail car design.

The fabrication area includes welding spaces, exhaust systems, overhead cranes, in-floor utility trenches and special fabrication equipment. This phase added one clear span bay 85’ x 1600’ to the north side of the facility. A previously undefined phase was also completed and contained the construction of quality control offices, employee training rooms and mezzanine storage in a portion of the phase two project area.

Additional phases included a function test building; site and utility work; a new test track; the southeast addition (64,000 SF  of storage and fabrication area including new loading docks); and facility site alterations and additional parking areas.