West River Electric Association

View All Corporate Campus Projects

Corporate Campus

Print

West River Electric Association

The West River Electric Association is utilizing a geothermal heating and cooling system for their new office and warehouse facility. This two-story office corporate campus project included an insulated pre-cast exterior, lower level completed for administrative use, and upper level for future expansion.
The 85,000 SF building includes : a locker room area for the linemen, luncheon areas, and administrative space as well as a maintenance/warehouse area. The project resides on a large campus that was asphalted for transformer, light pole and wire storage. The maintenance/warehouse area also utilizes a heated slab for a heat source. The building supplements heating sources with forced air units, as well as, wallcove heaters in the offices that customize the heating/cooling environment for multiple working zones.

Project Details

End Use:
Location:
Rapid City, South Dakota
Size:
45,120 SF New Warehouse; 39,800 SF New Offices
Type:
Corporate Campus
Method:
Design Bid Build