Sysco Food Services (formerly Pegler/Sysco) and Sampson Construction have had an ongoing relationship since the early 1990s. Our team has completed multiple new construction and remodel projects with the Sysco team, with the most recent being a warehouse and freezer addition that was completed in 2005.

The facility underwent a 50,200 SF addition and 14,230 SF remodel. The addition to the warehouse included a dry storage warehouse area with a new racking system to better accommodate the facility. The structural design accommodated the large floor loads and required clear heights. The freezer addition was provided to enlarge their existing freezer facility. A complete self-enclosed low-temperature structure was provided for the -10 degrees Fahrenheit freezer area. The concrete floor was constructed to accommodate rack loads and to prevent freezing of the sub-grade below the slab.

Project Details

End Use:
Location:
Lincoln, Nebraska
Size:
50,200 SF New; 14,230 SF Renovation
Type:
Manufacturing/Distribution
Method:
Construction Manager