The Lincoln East High School renovation was one of four high schools that was a part of a $250 million dollar bond issue that was passed "to enhance" the Lincoln Public School District.
Lincoln East High School has experienced multiple phases of renovations, since it opened in 1967. The most recent renovation included mechanical and electrical system upgrades, an expansion to the existing kitchen/cafeteria, relocating the main office, and restoration of the auditorium. The auditorium seats 845 and includes ADA seating stadium seating in the back of the theatre. A new cat walk system was designed and tied into some of the existing layout to allow for access to the light control stations.

Project Details

End Use:
Location:
Lincoln, Nebraska
Size:
443,000 SF Renovation; 7,200 SF New
Type:
K-12 Schools
Method:
Construction Manager at Risk